CAES Engineering supplied and installed a Stainless Steel and MDPE pipework package. All stainless pipework and containment were pre-fabricated with no hot works carried out on site!
SOME OF THE TASKS THAT WE SUCCESSFULLY COMPLETED DURING THE CONSTRUCTION:
- Approximately 300m of 180mm MDPE pipework
-
- Approximately 500m of 125mm Stainless Steel pipework
-
- Bracketry design